Carnegie Swim Centre

With longer days and shorter shadows, Carnegie Swim Centre is a great place to spend the warmer months.

From November 1 until the end of March, escape the heat, host a children’s party, or just enjoy the fitness benefits of regular swimming.

Features

  • Outdoor Pool

  • Kiosk

  • Retail

  • Beach Volleyball Court

Opening Hours

Pool Season

Carnegie Swim Centre is a seasonal pool and will be open from November 1 2019 to March 31 2020.

Live pool availability guide


Toddler Pool

Monday to Friday — 10am to 7pm

Saturday and Sunday — 10am to 6pm


Wading Pool

Monday to Friday — 10am to 7pm

Saturday and Sunday — 10am to 6pm


50m Pool

Monday to Friday — 6am to 7pm

Saturday — 7am to 6pm

Sunday — 8am to 6pm


Dive Pool*

Monday to Friday — 4pm to 7pm (only 25°C+)

Saturday — 1pm to 6pm (only 25°C+)

Sunday — 1pm to 6pm (only 25°C+)


Swim Carnivals

Opening hours may be subject to Swim Carnivals.


Hot Weather Policy**

On days above 30 degrees the 50m pool will stay open until 8pm. All other pools will close as normal  


*Please note that the Dive pool's availability is subject to bookings from 1pm to 6pm.

**Extended hour of operation will be confirmed at 3pm each day and is dependent on temperature at that time and staffing availability.

Pricing

Whether you'd like to drop in for a casual, single swim, or lap the pool all summer long, we have a range of pricing and membership options for you.

View Casual Pricing

Carnegie Swim Centre Redevelopment

Carnegie Swim Centre is a much-loved part of Glen Eira where many memories have been made for more than 50 years. The buildings and pools are now at the end of their serviceable life and need to be replaced.

Our community is growing and we need to broaden the facilities at Carnegie Swim Centre to cater for the additional demand for aquatic and leisure facilities. In doing so, we intend to retain the essential elements of Carnegie Swim Centre, as we know that is important.

The concept plans for Carnegie Swim Centre include a mix of indoor and outdoor pools and activities. The intent is to retain the local pool characteristics as requested in previous community feedback.

The redevelopment will see the Centre become an all-year-round leisure facility, with a range of services for a broader section of the community. This will enable us to provide programs, such as learn-to-swim, and targeted programs to meet specific community health needs, delivering a range of physical and mental health benefits.

Concept designs

We are undertaking consultation on the redevelopment options for the Carnegie Swim Centre. Three options are being proposed and we want to find out which option the community prefers.

Option A and B will both have redeveloped indoor and outdoor pools.

  • Option A — will include beach volleyball but excludes a diving pool.
  • Option B — will include an outdoor diving pool but excludes beach volleyball.
  • Option C — close existing Swim Centre, re-establish open space and investigate options to extend GESAC.

We want to hear from you

You can find out more detail on the plans, see concept design images for each option, and fill in a short survey on which option you would prefer.

Take our survey

Consultation closes on Friday 31 January 2020. The community consultation report will be published on the Council’s Have your Say online forum in early 2020.